Commercial

Project Image

Oak Mountain Presbyterian Sanctuary & Education Building

Birmingham, Alabama

  • Mechanical Engineer and Project Manager for Mechanical, Plumbing and Fire Protection systems design for 2-story, 58,000 SF addition, including sanctuary, education classrooms and administrative offices; $6.9 million construction budget.
+ Learn More
Project Image

The Summit VI Office Building

Birmingham, Alabama

  • Project Manager and Mechanical Engineer for Mechanical, Plumbing and Fire Protection systems for tenant fitout for 35,000 SF for accounting firm, including private offices, conference rooms, IT equipment rooms; Mechanical, Plumbing and Fire Protection systems design; $ 1.6 million construction budget.
+ Learn More
Project Image

Crescent Building

Birmingham, Alabama

  • Project Manager and Mechanical Engineer for tenant fitout for Mechanical, Plumbing and Fire Protection systems for 140,000 SF office building.
+ Learn More
Project Image

Alabama Power Headquarters Complex

Birmingham, Alabama

  • Data Center: 16,000 SF space provided with mechanical upgrade for cooling redundancy. Project included 260 tons of dual coil computer room units, dry cooler central plant located on the roof, and primary/secondary Glycol pumping system.
  • New Central Plant, Phase 1: 5,500 SF central plant building to house hot water boilers and centrifugal chillers to serve adjacent 1.2 million SF headquarters complex. Piping from central plant (2-16” chilled water, 2-6” hot water) was routed under pedestrian crosswalk from parking deck over a city street. Hot water system included 2-1560 kW boilers, associated pumps, distribution piping, and plate & frame heat exchangers that replaced existing steam shell and tube heat exchangers. Central Plant included provisions for future installation of centrifugal chillers, cooling towers, plate & frame waterside economizer, and pumps. New automation controls were interfaced with existing Building Automation System.
  • New Central Plant, Phase 2: Two 1,000-ton centrifugal chillers, two 1,000-ton cooling towers, condenser water filtration system, plate & frame water-side economizer, associated pumps, ASHRAE Standard 15 ventilation system, and automation system. Cooling towers were mounted on a service platform located on the roof of central plant building. New chilled water system operates in parallel with existing ice storage system.
+ Learn More
Project Image

Tuscaloosa Fire & Rescue Service Training & Logistics Facility

Tuscaloosa, AL

  • Mechanical systems design for 1800 SF renovation and conversion of existing fire station to Training & Logistics Facility; $110,000 construction budget.
+ Learn More
Project Image

Birmingham Fire Department Station #12

Birmingham, AL

  • Mechanical Engineer and Project Manager for Mechanical, Plumbing and Fire Protection systems for new 3-bay 7900 SF fire station, including dedicated vehicle exhaust system, day room, sleeping quarters, kitchen and locker room; $1.0 million construction budget.
+ Learn More
Project Image

Birmingham Fire Department Station #11

Birmingham, AL

  • Mechanical Engineer and Project Manager for Mechanical, Plumbing and Fire Protection systems design for new 8500 SF fire station, including 3 bays with dedicated vehicle exhaust system, day room, sleeping quarters, kitchen and locker room; $1.1 million construction budget.
+ Learn More