Administration Building: University of Alabama at Birmingham
Prime consultant for removal of existing 600-ton chiller/cooling tower and replacement with two 300-ton centrifugal chillers and cooling towers. Chillers and cooling towers were located in penthouse on the fourteenth floor. Scope of work also included replacement of domestic water booster system and hydro-pneumatic storage tank, cooling tower filtration system, ASHRAE Standard 15 ventilation system, and upgraded motor control center. Changeover was completed during Christmas Holiday without disruption to normal building operations.