Provided M/P/FP engineering services for this 215,425 SF facility consisting of two 4-story residence halls.  Mechanical systems included split-system DX cooling with hydronic heating from gas-fired boilers.  Fire protection work included fire pump.  M/P/FP budget of $3.71 million.

University of Alabama: Lakeside Residence Hall